learnex

 
SAP PP
  • Course Content 

    • Over view of SAP
    • SAP Architecture
    • MASTER DATA
    • Master Material & Material types
    • Bills of Material
    • Work Center Resources
    • Routing, Rate routing, Recipes
    • SALES & OPERATION PLANNING
    • STANDARD PLANNING
    • (With standard so76 info structure)
    • Planning with Product Groups
    • Planning with Material
    • Product group aggregation and desegregation
    • Creation of plan
    • Planning methods _level by level
    • Consistent delta planning
    • Transfer of plan to demand
    • Management and splitting
    • MASTER PLANNING
    • Demand planning
    • Planning strategies
    • Functions of demand management
    • Version management
    • Creation of planned independent
    • Requirements
    • Forecasting
    • PLANNING MATERIAL REQUIREMENT
    • Master data in MRP
    • Planning with technique and business
    • Information
    • MRP, procedures MRP, MPS & CBP
    • (Consumption based planning)
    • Carrying out planning run (MRP run)&planning file
    • Control indicators processing key in MRP
    • (NETCH.NETPL NEPL)
    • Evaluation of planning results and planning table
    • Master production scheduling (mps run)
    • Processing planned orders
    • Availability check w.r PIR &ATP logic
    • Capacity planning &capacity leveling
    • SHOP FLOOR CONTROL (production
    • Orders _DESCRETE MANAGEMENT)
    • Production order maintenance
    • Copying master data
    • Scheduling -basic date and lead-time
    • SCHEDULING
    • Availability check in production orders
    • Goods movement and movement types
    • Production order confirmation
    • OTHERS
    • Batch management
    • Material class
    • Batch status management
    • Batch determination
    • CLASS AND CLASSIFICATION
    • Material class
    • Batch class
    • Creation of objects
    • Creation of class and assigning of
    • Characteristics values
    • INTEGRATION WITH OTHER MODULES
    • THEORY ANDINTEGRATING SETTINGS
    • Module production costing in co module
    • Quality management -QM module
    • Materials Management- MM module
    • REPETITIVE MANUFACTURING
    • Master data
    • REM profile
    • Production versions
    • Rub schedule headers
    • Cost collectors
    • Preliminary cost estimate
    • Planning with planning table
    • REM back flushing
    • IMPLEMENTATION METHODOLOGY
    • Implementation procedure as per ASAP
    • Methodology